The Precon platform

One system.
Every element.

Precon runs the daily work of design, production, quality, logistics and site around the physical element, so every department updates the same record and management sees one position.

WP-0142 · CAST 06:40QC PASS · ITP 7/7 SIGNEDDN-2231 · DISPATCHEDAED 18,400 · VALUE RECORDEDERECTED · L4 / GRID C

The operating model

One element.
Six stages.

Every update stays on the same element identity, so the handoff between teams changes without the record breaking apart.

  1. 01

    Design release

    Keep element identity, revisions, quantities, zones, and issue context ready for downstream teams.

  2. 02

    Production

    Record casting dates, production element numbers, factories, and concrete mix information.

  3. 03

    Quality

    Record quality approval and surface produced elements that still require a decision.

  4. 04

    Delivery

    Connect approved elements to delivery orders, transporters, and delivery dates.

  5. 05

    Erection

    Record site and erection milestones against the same element used by the factory.

  6. 06

    Final approval

    Complete the operational history with final inspection and approval information.

Available today

The work behind one dependable position.

Operate high-volume element records

Find one element or update a practical group without losing project context.

  • Search and filter by project, tag, number, factory, mix, status, or date
  • Import existing element information from spreadsheets
  • Use bulk updates for repeat operational work
  • Export operational records to CSV

Report across factory and site

Prepare repeatable views from maintained records instead of rebuilding them at each reporting cycle.

  • Production and balance production
  • Quality, delivery, and erection activity
  • Manpower and transmittal reporting
  • Project, cross-project, and element-tag summaries

Keep ownership clear

Let each department maintain its part while management sees the combined position.

  • Authenticated access
  • Department-based controls
  • Change accountability and later review
  • Shared project and business reference data

Deeper workflows

Add depth
where you need it.

Enhanced quality module
Configurable inspection and test plans, checkpoints, evidence, signatures, NCR workflows and exportable chain-of-custody records.
AI Operations Analyst pilot
A controlled, read-only pilot for narrow questions about production, incomplete elements and quality approval queues. It does not edit, approve or dispatch work.
WP-0142 · AWAITING QCAPPROVED · ITP 7/7 SIGNED

Keep the systems that already do their jobs.

Precon complements design, BIM, ERP, accounting and general project systems by owning the operational element lifecycle between them.

Spreadsheet import and CSV export are available today. Specific system integrations are confirmed during discovery before any commitment.

See Precon on your workflow.

Bring a project, the departments involved, and a report your team currently assembles by hand. We will show the relevant operating flow and define a practical pilot.